Tag Archives: hose stretches

The Long Stretch and Push

Entry Img

When looking at this type of building we need to consider the construction type, occupancy, access and egress points and any special hazards. What are our initial resources and what should we have coming on the way? This building is four stories and is a dormartory at a college. The corridor length is 225 from stairwell to stairwell. As you look at the building in the picture, the stairwell on the right is more remote from a parking surface than the one on the left.

Hose Deployment

Entry Img

We have to remember that the atypical fire requires atypical tactics in some cases and the norm of pulling a 1 3/4 inch cross lay or speed load just isn’t going to get it done.

background image Blogger Img

Jason Hoevelmann

Deputy Chief/Fire Marshal with the Sullivan Fire Protection District, a combination department, and a career firefighter/paramedic with the Florissant Valley Fire Protection District in North St. Louis County.

Jason Hoevelmann's Discussions

/* Removes Buzzboost Logo (MBT) */ div #creditfooter{ display: none; }
Follow Jason Hoevelmann

AFFOWE Calandar

August 2014
M T W T F S S
« Jul    
 123
45678910
11121314151617
18192021222324
25262728293031

FireEMS Blogs eNewsletter

Sign-up to receive our free monthly eNewsletter

LATEST FIREFIGHTER NEWS

HOT FORUM DISCUSSIONS

LATEST ON FIRE ENGINEERING

FEATURED DISCUSSIONS